This Week in Photos

By: Embrocation Dec 14

Share |

2012-12-11_15-24-45_350Corsa front end in the jig, ready for tacking.


2012-12-11_15-23-59_157Correct.


2012-12-11_14-30-24_909Dropouts.


IMG_20121211_160659BB cluster on a freshly welded Corsa. Note drilling for electronic shift cable routing.


IMG_20121211_155032Aluminum tubes ready for fitment in the jig.


IMG_20121211_154759Old school computer terminal on one of our CNC machines. Gets the job done; never crashes.


IMG_20121211_154644Drill press with multiple tools allows for quick changes and wonderfully diverse functionality.


IMG_20121211_153720Drilling for Campy EPS battery mount on the back of the seat mast.


 

|

© Copyright 2013 - Embrocation Cycling, INC